Search
Close this search box.

‘IMPHAL’- 3rd Stealth Destroyer of P15B Delivered To The Indian Navy

Mazagon Dock Shipbuilders Limited (MDL) has delivered the Third Stealth Destroyer of Project 15B Class Guided Missile Destroyer i.e., Yard 12706 (IMPHAL) to the Indian Navy. INS IMPHAL The Acceptance...

Mazagon Dock Shipbuilders Limited (MDL) has delivered the Third Stealth Destroyer of Project 15B Class Guided Missile Destroyer i.e., Yard 12706 (IMPHAL) to the Indian Navy.

INS IMPHAL

The Acceptance Document was signed by Sanjeev Singhal, Chairman & Managing Director, MDL and RAdm Sanjay Sadhu, AVSM, NM, CSO (Tech) at MDL in the presence of Commanding Officer (Designate) Capt. K K Choudhury, MDL Directors, WOT(MB) and Navy personnel today.

image 663

Specifications

The ship is constructed using Indigenous Steel DMR 249A and is amongst the largest Destroyers constructed in India, with an overall length of 164 meters and a displacement of over 7500 Tons. The ship can accommodate a crew of 312 persons, has an endurance of 4000 Nautical Miles and can carry out a typical 42 days mission with extended mission time in out of area operation.

image 664

The ship is a potent platform capable of undertaking a variety of tasks and missions, spanning the full spectrum of maritime warfare. It is armed with supersonic Surface-to-Surface ‘Brahmos’ missiles and ‘Barak-8’ Medium Range Surface to Air Missiles.

Indigenous Content

The indigenous content in P15B Class Destroyers is 72% which is a notch above their predecessors P15A (59%) and P15 (42%) Class Destroyers, reaffirming the Government’s focus in ‘Atmanirbhar Bharat’ Programme along with large eco system development of sub vendors.

image 666

Trials

This ship has completed all Sea Trials in 03 CSTs (Contractor’s Sea Trials) including firing of major critical weapons in the very first CST. The first Ship of P15B (Visakhapatnam) was commissioned on 21 Nov 2021. The 2nd ship (Mormugao) was commissioned on 18 Dec 2022. The 3rd ship (IMPHAL) has been delivered to Indian Navy on 20 Oct 2023. The 4th ship (Surat) was launched on 17 May 2022 and is at an advance stage of outfitting.

image 665

MDL

MDL has always been at the forefront of the nation’s progressive indigenous warship and submarine building programme. With the construction of the Leander and Godavari class Frigates, Khukri class Corvettes, Missile Boats, Delhi and Kolkata class Destroyers, Shivalik class Stealth Frigates, Visakhapatanam class Destroyers, Nilgiri class Frigates ,the SSK submarines.

Leave Your Comment

Related Posts

Recent Posts